QUICK NOTE: EXPERT TESTIMONY – BACK TO THE FRYE TEST IN FLORIDA

imagesExpert testimony (opinions) – very important testimony in construction disputes.  Whether it is a delay claim, an inefficiency claim, a defect claim, etc., expert testimony plays an invaluable role in construction disputes.   Construction attorneys work closely with expert witnesses to ensure that an expert helps render an opinion to support their client’s burden of proof (including damages) or an affirmative defense.

 

 Recently, the Florida Supreme Court ruled that the Frye test governs the admissibility of expert testimony in Florida State courts.   Notably, this was the test used until circa 2013 until the Florida Legislature modified Florida’s Evidence Code to require the Daubert test to apply to determine the admissibility of expert testimony.  The Daubert test is the test used in federal courts and, quite frankly, is a more rigorous standard/test.   For more information on the Frye and Daubert test, please check out this article that I wrote to summarize Florida’s transition back to the Frye test.  In any event, this transition back to the Frye test can be both good and bad depending on who you represent in a Florida State court action and the expert opinion you are looking to introduce.  

 

 

Please contact David Adelstein at dadelstein@gmail.com or (954) 361-4720 if you have questions or would like more information regarding this article. You can follow David Adelstein on Twitter @DavidAdelstein1.

COMPETING EXPERT WITNESSES IN AN INSURANCE COVERAGE DISPUTE

shutterstock_363608708Oftentimes, insurance coverage disputes involve competing expert witnesses.  The experts render different expert opinions regarding a topic that goes to coverage and/or damages.  An example of competing expert witnesses can be found in the recent property insurance coverage dispute, Garcia v. First Community Ins. Co., 43 Fla.L.Weekly D671a (Fla. 3d DCA 2018). 

 

In this case, an insured submitted a claim under her homeowner’s policy for water damage due to a roof leak.  She claimed her damage was approximately $23,000.  The insurer denied coverage and an insurance coverage dispute ensued.

 

The insured’s policy, akin to many homeowner’s policies, contained exclusions for loss caused by:

 

h. Rain, snow, sleet, sand or dust to the interior of a building unless a covered peril first damages the building causing an opening in a roof or wall and the rain, snow, sleet, sand or dust enters through this opening.

 ***

i. (1) Wear and tear, marring, deterioration;

 

The insurer sent an engineer to inspect the insured’s property and the engineer (expert) opined that the water intrusion was not covered under the policy based on the aforementioned exclusions.  Her opinion was that the water intrusion through the roof was the result of deterioration from age, tree branch abrasions, and construction defects based on how nails were installed into the shingles.  Based on this opinion, the insurer was denying coverage based on the (i) wear and tear, marring and deterioration exclusion and (ii) rain intruded through the roof based on a peril (construction defect) that was not covered under the policy.

 

The insured, as expected, had a competing expert that opined that a hail impact or high wind uplift (covered peril) in the days leading up to the rain event caused water to intrude through the roof and cause interior damage.   Under this opinion, the insured was presenting an expert opinion for coverage and why the insurer’s exclusions were inapplicable.

 

In this case, surprisingly, the trial court granted summary judgment in favor of the insurer.  However, this was reversed on appeal because the competing opinions as to coverage and the cause of the insured’s loss created a genuine issue of material fact.  Summary judgment cannot be granted if there are genuine issues of material fact.  See Garcia, supra, (“Given this conflict in the material evidence as to the cause of the loss, the trial court erred in entering final judgment in favor of First Community [insurer].”).

 

Another argument the insurer raised was that its engineer inspected the property within months after the date of loss whereas the insured’s expert is basing an opinion on an inspection that occurred three years after the fact.   This fact, albeit true, does not create a genuine issue of material fact.  Rather, it goes to the credibility of the experts at trial.  Which expert is more credible regarding the cause of the loss:  the insurer’s expert that inspected the property a few months after the loss or the insured’s expert that inspected the property years after the loss.  Well, the issue of credibility and how a jury / trier of fact weighs this in consideration of other evidence is not appropriate in determining a motion for summary judgment. See Garcia, supra.

 

Experts are an important part of construction disputes including insurance coverage disputes and it is not uncommon for there to be competing expert opinions as to the cause of a loss, a defect, and, of course, damages.   

 

Please contact David Adelstein at dadelstein@gmail.com or (954) 361-4720 if you have questions or would like more information regarding this article. You can follow David Adelstein on Twitter @DavidAdelstein1.

UTILIZING EXPERT WITNESSES FOR CONSTRUCTION DISPUTES


Expert witnesses are an integral part of construction disputes.  An expert assists a party in proving or disproving liability or damages. In construction disputes, an expert could be used relating to a construction or design defect, a delay, an inefficiency, the standard of care, building code violations, the repair protocol, etc.   Irrespective of the basis for retaining an expert, oftentimes the expert generates a report with his/her opinions (and documentation relied on to form those opinions), is deposed, and, if the case proceeds to trial, is relied on to provide expert opinion testimony. 

Recently, I wrote an article about the Daubert test which is a court’s gatekeeping test to determine whether the expert opinion testimony is admissible.  Parties utilizing experts in construction disputes need to understand this Daubert test.  Please take a look at this article to familiarize yourself with Daubert to ensure you are engaging and preparing the right expert.

Additionally, I wrote another article on expert opinion testimony including the standard of appellate review if a court strike’s expert opinion testimony or allows an expert to testify subject to an objection.  Please take a look at this article because it is common for a party prior to trial to move to strike an opposing expert or portions of that expert’s opinion testimony.

 

Please contact David Adelstein at dadelstein@gmail.com or (954) 361-4720 if you have questions or would like more information regarding this article. You can follow David Adelstein on Twitter @DavidAdelstein1.