A LANDLORD’S REFUSAL TO TIMELY PERFORM NEEDED REPAIRS / MAINTENANCE ITEMS
Posted on 29 November, 2013
LEGAL COMPLEXITIES WHEN THERE IS A FAILED PROJECT
Posted on 28 November, 2013
CONSULTANT’S CORNER: PERSPECTIVES FROM A PROPERTY MANAGER REGARDING DEVELOPER TURNOVER
Posted on 23 November, 2013
Consultant’s Corner: In addition to providing perspectives and analysis from a lawyer, it is beneficial to hear from industry professionals and consultants. These are the folks that serve as expert witnesses during litigation / trial and consult with owners and contractors preconstruction, during construction, and postconstruction....
CONSULTANT’S CORNER: FIVE TIPS FOR BETTER CONSTRUCTION PROJECT DOCUMENTATION
Posted on 20 November, 2013
Consultant’s Corner: In addition to providing perspectives and analysis from a lawyer, it is beneficial to hear from industry professionals and consultants. These are the folks that serve as expert witnesses during litigation / trial and consult with owners and contractors preconstruction and during construction. Consultant’s...
About The Author
David Adelstein
Phone: (954) 361-4720
Email: Dadelstein@gmail.com
Pages
- About Me (David Adelstein)
- Bid Protests (Florida bid protests and Federal bid protests)
- Construction & Design Defects (and Florida Statutes Chapter 558)
- Construction Contracts
- Construction Liens
- Construction Safety, Workers Compensation Insurance, and Premise Liability Claims
- Delays, Acceleration, and Inefficiency (Lost Productivity)
- Insurance and Performance Bonds
- Payment Bonds Including Miller Act
Recent Posts
- QUICK NOTE: TERMINATION FOR CONVENIENCE PROVISIONS GIVE A PARTY BROAD DISCRETION TO END A CONTRACTUAL RELATIONSHIP
- QUICK NOTE: JUST BECAUSE A DISCRETIONARY CONTRACTUAL PROVISION DOESN’T GO YOUR WAY DOESN’T MEAN THE OTHER PARTY BREACHED THEIR IMPLIED COVENANT OF GOOD FAITH AND FAIR DEALING
- PROVING THE ELEMENTS OF A CONSTRUCTIVE ACCELERATION CLAIM REQUIRES PROOF THAT THERE WAS AN EXCUSABLE DELAY