STATUTE OF LIMITATIONS ON PERFORMANCE BOND CLAIMS
Posted on 1 October, 2013
Owners need to understand the benefit of a performance bond before deciding they do not want to reimburse the contractor for the premium associated with the bond. The performance bond is designed to guarantee the contractor’s faithful performance...
MAKE SURE CONSTRUCTION LIENS ARE PROPERLY PREPARED AND DO NOT CONTAIN ERRORS
Posted on 29 September, 2013
CONDO ASSOCIATIONS AND CONSTRUCTION LIENS
Posted on 20 September, 2013
Condominium associations hire contractors for capital improvements and repair / restoration work to common elements (painting, balcony/concrete/stucco restoration or repairs, etc.). When a condominium association hires a contractor to provide labor, services, or materials to the condominium, it needs to understand that nonpayment can lead to the...
PROPERTY (INCLUDING ALL-RISK) INSURANCE POLICIES AND THE EFFICIENT PROXIMATE CAUSE DOCTRINE
Posted on 19 September, 2013
An important new insurance coverage case came out dealing with “all risk” property insurance policies (such as homeowners or builders risk policies). The case, American Home Assurance Co. v. Sebo, 38 Fla. L. Weekly D1982a (2d DCA 2013), discusses when coverage applies when both excluded and covered...
A SURETY’S RIGHT TO DEMAND COLLATERAL SECURITY
Posted on 17 September, 2013
Before payment and performance bonds are issued by a surety, the bond principal-contractor is required to execute an indemnity agreement with the surety that is often personally guaranteed. The indemnity agreement is naturally written in favor of and for the benefit of...
About The Author

David Adelstein
Phone: (954) 361-4720
Email: Dadelstein@gmail.com
Pages
- About Me (David Adelstein)
- Bid Protests (Florida bid protests and Federal bid protests)
- Construction & Design Defects (and Florida Statutes Chapter 558)
- Construction Contracts
- Construction Liens
- Construction Safety, Workers Compensation Insurance, and Premise Liability Claims
- Delays, Acceleration, and Inefficiency (Lost Productivity)
- Insurance and Performance Bonds
- Payment Bonds Including Miller Act