QUICK NOTE:…OWNERS AND CONTRACTORS PROTECTIVE LIABILITY INSURANCE (OCP COVERAGE)
Posted on 8 March, 2020
Recently, I negotiated a contract that included Owners and Contractors Protective Liability insurance, otherwise known as “OCP” coverage, which is a project-specific policy. Thus, the policy limits are project-specific. Obtaining this OCP coverage includes discussion with a sophisticated insurance broker because the objective is always to ensure that there...
GENERAL TIPS WHEN IT COMES TO CONSTRUCTION CONTRACT DRAFTING AND NEGOTIATION
Posted on 7 March, 2020
When it comes to construction contracts, there are many good industry form templates that can be used. All are templates and all are designed to be modified to conform to the jurisdiction’s law and, of course, the parameters of the project. There are industry form templates from the...
QUICK NOTE: FRAUDULENT NOTICE OF NONPAYMENT
Posted on 1 March, 2020
There is a defense to construction liens raised by owners known as the fraudulent lien defense. A party can assert a fraudulent lien as an affirmative defense or as an affirmative claim. This is embodied in Florida Statute s. 713.31.
Recently, with respect...
PERFORMANCE BOND SURETY’S EQUITABLE SUBROGATION CLAIM AGAINST OWNER
Posted on 29 February, 2020
There are circumstances where a performance bond surety will pursue a claim against an owner – such as a government owner—and assert an equitable subrogation claim. A performance bond surety may assert an equitable subrogation claim to recover contract funds that are still in...
QUICK NOTE: PARTY ENTITLED TO EVIDENTIARY HEARING ON MOTION TO DISCHARGE LIS PENDENS NOT BASED ON DULY RECORDED INSTRUMENT
Posted on 25 February, 2020
When a lis pendens is recorded and it is NOT founded on a duly recorded instrument such as a mortgage or a lien, the Court has the power to either discharge the lis pendens or require that a lis pendens bond be posted. Typically, when the...
About The Author

David Adelstein
Phone: (954) 361-4720
Email: Dadelstein@gmail.com
Pages
- About Me (David Adelstein)
- Bid Protests (Florida bid protests and Federal bid protests)
- Construction & Design Defects (and Florida Statutes Chapter 558)
- Construction Contracts
- Construction Liens
- Construction Safety, Workers Compensation Insurance, and Premise Liability Claims
- Delays, Acceleration, and Inefficiency (Lost Productivity)
- Insurance and Performance Bonds
- Payment Bonds Including Miller Act