WHAT TRIGGERS A LIABILITY INSURER’S DUTY TO DEFEND


Parties in construction absolutely need to understand what triggers the duty of a liability insurer to defend a lawsuit. This needs to be understood not only by the insured-party being sued, but by the entity suing the insured-party. A liability insurer’s duty to defend its insured in a lawsuit is broader than its duty to indemnity its insuredKeen v. Florida Sheriff’s Self-Insurance, 962 So.2d 1021, 1024 (Fla. 4th DCA 2007). The duty to defend is based on allegations in the complaint if the allegations potentially bring the claim within the policy’s coverageId.; Pennsylvania Lumbermens Mut. Ins. Co. v. Indiana Lumbermens Mut. Ins. Co., 43 So.3d 182, 186 (Fla. 4th DCA 2010). “Once the insurer’s duty to defend arises [based on the allegations in the underlying complaint], it continues throughout the case unless it is made to appear by the pleadings that the claims giving rise to coverage have been eliminated from the suit.”  Pennsylvania Lumbermens, 43 So.3d at 186 quoting Baron’s Oil Co. v. Nationwide Mut. Ins. Co., 470 So.2d 810, 815 (Fla. 1st DCA 1985).

 

The recent opinion in Nationwide Mutual Fire Ins. Co. v. Advanced Cooling and Heating, Inc., 38 Fla. L. Weekly D2256a (Fla. 4th DCA 2013), demonstrates an insurer denying the duty to defend because the allegations against the insured did not potentially fall within the policy’s coverage. In this case, a service HVAC contractor was contacted because of a residential owner’s problem with an existing air conditioning system. The owner agreed to pay the HVAC contractor to install a new compressor. However, after the compressor was installed, the owner realized this did not cure his air conditioning problems and decided to stop the payment to the contractor. The HVAC contractor sued the owner and the owner counterclaimed asserting that the HVAC contractor breached the contract by failing to properly inspect his air conditioning system which resulted in unnecessary repair. The HVAC contractor tendered the counterclaim to its CGL carrier to defend it; the insurer denied coverage since the allegations in the complaint did not potentially trigger policy coverage.

 

The HVAC contractor retained counsel and successfully prevailed against the owner’s counterclaim. It also filed a lawsuit against its CGL insurer for a declaratory judgment that its insurer had a duty to defend it. The trial court agreed with the HVAC contractor and awarded fees and costs against the insurer pursuant to Florida Statute 627.428. (This statute allows for an insured to recover its attorneys’ fees and costs if it obtains a judgment against its insurer.)

 

The Fourth District, on appeal, reversed finding that the insurer did not have a duty to defend based on the owner’s allegations in the complaint. As the Fourth District found: “The [CGL] insurance policy issued to Advanced [insured-contractor] covers “bodily injury” or “properly damage” resulting from an “occurrence” pursuant to the policy definitions. The [residential owner’s] breach of contract claim alleges only that an improper or unneeded repair resulted in an unnecessary $438 expense to the customer. There are no allegations of bodily injury or property damage at all.”  Advanced Cooling and Heating, supra.

 

The insured-contractor tried to argue that the residential owner claimed that it installed the compressor in an unworkmanlike manner that caused a leak in the air conditioning system that damaged the compressor. However, the Fourth District shot this down because damage to the compressor or the air conditioning system was not resulting damage or property damage other than the property being repaired.

 

Liability insurance is not designed to cover the insured’s defective work or damage to the insured’s work caused by the insured. In the residential owner’s underlying claim, there was not personal injury or property damage resulting from the service HVAC contractor’s work. Understanding the duty of a liability insurer to defend a lawsuit should be important to any plaintiff seeking insurance coverage to pay for damage. Likewise, it is important to the insured-contractor that expects or wants its insurer to defend it in what can be a costly litigation.

 

For more information on liability insurance coverage, please see https://floridaconstru.wpengine.com/cgl-policies-and-the-importance-of-couching-the-claim-to-the-insurer/

 

Please contact David Adelstein at dadelstein@gmail.com or (954) 361-4720 if you have questions or would like more information regarding this article. You can follow David Adelstein on Twitter @DavidAdelstein1.

UNDERSTANDING YOUR RIGHTS AS AN ADDITIONAL INSURED


Being an additional insured is a topic discussed, and it absolutely should be, in the negotiation of construction contracts. It is an important part of risk management in construction. An owner wants its contractor and consultants to name it as an additional insured under their liability policies. A contractor, likewise, wants its subcontractors, etc. to name it as an additional insured under their liability policies.

 

Let’s say a general contractor wants its window/glazing subcontractor to name it as an additional insured under the subcontractor’s commercial general liability (CGL) policy. The window subcontractor would be the primary or named insured under its CGL policy. The general contractor, smartly, wants the window subcontractor’s CGL policy to have an endorsement that identifies the general contractor as an additional insured under that policy (ideally, for both ongoing and completed operations). By adding the general contractor as an additional insured, the window subcontractor is protecting / providing coverage to the general contractor for the window subcontractor’s negligence. It is not designed to protect the general contractor for its negligence — so the general contractor will still need its own liability insurance; rather, it is again designed to provide coverage to the general contractor for the window subcontractor’s negligence.

 

Let’s also say that during the subcontractor’s operations or after, an incorrectly installed window simply fell and caused an injury to a person or damage to property other than the window. (Yes, an extreme example!) As a result of the injury / damage, both the general contractor and the window subcontractor get sued. The general contractor will seek indemnification from the window subcontractor and the subcontractor’s CGL policy as an additional insured under the subcontractor’s policy. The reason being is that the general contractor wants to be indemnified by the subcontractor and have the subcontractor’s insurer provide it a defense and coverage because the window fell out due to the subcontractor’s negligence.

 

In this situation, either the window subcontractor’s CGL insurer should provide (pay for) a defense for both the window subcontractor (named insured) and the general contractor (additional insured) subject to the insurer’s reservation of rights. This can be done by the insurer retaining counsel for both the named insured or additional insured or, which may be the case in a multi-party litigation such as a multi-party construction defect case, contributing to the general contractor’s defense.

 

Importantly, in the recent decision of University of Miami v. Great American Insurance Co., 38 Fla. Law Weekly D392a (Fla. 3d DCA 2013), the Third District maintained that where both the named insured and additional insured have been sued in negligence with allegations that both caused the injury / damage to the plaintiff, the insurer (for the named insurer) is required to provide separate defense counsel for each in order to avoid conflicts of interest with one defense counsel. This is done to ensure that the additional insured has independent counsel to represent its interests.

 
Understanding rights of an additional insured is a must for any construction project in order to maximize insurance coverage and indemnification rights.

 

Please contact David Adelstein at dadelstein@gmail.com or (954) 361-4720 if you have questions or would like more information regarding this article. You can follow David Adelstein on Twitter @DavidAdelstein1.

CGL POLICIES AND THE IMPORTANCE OF COUCHING THE CLAIM TO THE INSURER


Contractors and subcontractors that work on construction projects should, and generally do, maintain commercial general liability policies (“CGL Policies”).  Owners absolutely want their contractor and the subcontractors to be sufficiently insured in the event a claim is made either against them or damages or defects occur to their project.  Likewise, the contractor wants its subcontractors to be sufficiently insured for the same reasons.   Contractors and subcontractors, jointly, want CGL Policies so that if a claim is made or they are sued the insurer defends their interests and, hopefully, pays insurance proceeds to resolve the claim.

 

Insurers, however, are not always keen on paying claims and rely on various exclusions in policies that are applicable to the circumstances of the claim.  In other words, if there is no coverage for the claim based on an exclusion, the insurer will appropriately rely on an exclusion in the CGL policy.  As it pertains to CGL Policies, there are two important exclusions insurers rely on when a claim is asserted against a contractor or subcontractor for construction defects.  These exclusions are known as the j(5) and J(6) exclusions and exclude damage to:

 

j(5)   That particular part of real property on which you…are performing operations, if the property damage arises out of those operations; or

 

j(6)   That particular part of any property that must be restored, repaired or replaced because your work was incorrectly performed on it.

 

A contractor or subcontractor that reviews their CGL Policies will find the j(5) and j(6) exclusions to be substantially similar to the above.  While contractors typically do not self-perform work, subcontractors typically do  self-perform all or a substantial part of the work.

 

A recent case, Wilshire Insurance Co. v. Birch Crest Apartments, Inc., 2011 WL 3586228 (4th DCA 2011), bolsters insurers’ arguments to exclude coverage under a self-performing subcontractor’s  CGL Policy under the (j)5 and j(6) exclusions.  In this case, a painter performing work on an apartment project spattered paint on glass doors and windows.  The painter tried to remove the paint spatter, and in the process of doing so, damaged the glass doors and windows.  The owner sued the painter and the painter consented to a judgment and assigned its rights under its CGL Policy to the owner. This allowed the owner to sue the insurer directly and assert certain claims against it.

 

The issue in this case was whether the painter’s damage to the glass windows and doors were covered under the policy, or, conversely, whether coverage was excluded pursuant to the j(5) and j(6) exclusions under the policy.  The Fourth District Court of Appeal held that these exclusions barred coverage for all of the owner’s damages:

 

“[T]he record here shows that cleaning paint spatter from windows and doors was within the natural and intended scope of work undertaken by the contractor as part of the painting operations on Birch’s [owner] property if in fact such paint spatter occurred.

***

[T]he scope of the contractor’s operations were intended to include the apartments which were being painted and would, if required, involve cleaning up surfaces which were spattered with paint.  There is no genuine issue of material fact that the property damage in this case was to the apartment upon which H&H [painter] was performing its operations, and that it arose out of the insured’s operations within the meaning of (j)5Additionally, there is no genuine issue of material fact that the underlying claim resulted from the insured’s incorrect work on the glass doors and windows of the apartments within the meaning of exclusion j(6).

Wilshire Insurance Company, 2011 WL at *2.

 

In this case, it appears that the owner hired the painter directly and that the painter self-performed the work.  This is noteworthy because had the owner hired the general contractor and the general contractor hired the painter, or had the painter hired sub-subcontractors to perform all of its work, there could have been certain arguments raised to maximize insurance coverage.  These arguments, however, will not be discussed in this specific post.  What is also noteworthy is that the Fourth District focused on what fell within the “natural and intended scope of work” of the self-performing painter.  Since the damage or activity of cleaning up paint on glass fell within the natural and intended scope of the painter’s work, the Fourth District found that the painter essentially damaged  property it was performing work on (the j(5) exclusion)  and, thus, required repairs to the painter’s own work (the j(6) exclusion).

 

It is imperative that when an owner, etc. submits a claim to a contractor or subcontractor’s CGL Policy, the owner consults with a lawyer in furtherance of couching the claim to optimize insurance recovery.  Furthermore, and equally important, when a contractor or subcontractor receives a claim, especially a claim for defects or damage, that they too should consult with a lawyer to best present the claim to optimize the insurer protecting their interests and paying proceeds to resolve the claim.

  

Please contact David Adelstein at dadelstein@gmail.com or (954) 361-4720 if you have questions or would like more information regarding this article. You can follow David Adelstein on Twitter @DavidAdelstein1.