THE IMPORTANCE OF AN EFFECTIVE NOTICE OF COMMENCEMENT ON YOUR LIEN RIGHTS
Posted on 6 August, 2014
Contractors, subcontractors, and suppliers need to appreciate the importance of an EFFECTIVE Notice of Commencement. This recorded document, among other things, governs the priority of YOUR lien rights on a private construction project because a construction lien RELATES BACK in time to an effective Notice...
HOME OFFICE OVERHEAD (EICHLEAY) AND GOVERNMENT-CAUSED STANDBY
Posted on 3 August, 2014
JMR Construction Corp. v. United States, 2014 WL 3418445 (Fed.Cl. 2014) is a good federal government contracting case discussing a prime contractor’s challenging burden to support unabsorbed home office overhead damages caused by a government-caused delay. The United States Court of Federal Claims...
LIEN RIGHTS FOR PROFESSIONAL (DESIGN) SERVICES
Posted on 1 August, 2014
THE OH NO! MOMENT – REALIZING THE SUBCONTRACTOR EXCEPTION WAS ELIMINATED FROM THE “YOUR WORK” EXCLUSION
Posted on 24 July, 2014
The recent Eleventh Circuit decision in J.B.D. Construction, Inc. v. Mid-Contintent Casualty Co., 2014 WL 3377690 (11th Cir. 2014), demonstrates the unfortunate applicability of the “your work” exclusion in CGL policies when the subcontractor exception (see image) to this exclusion was eliminated from the policy through an...
CONSTRUCTION RENTAL EQUIPMENT SUPPLIERS AND THE ENFORCEMENT OF LIEN RIGHTS
Posted on 17 July, 2014
Construction rental equipment suppliers play a large role in the performance of construction projects, whether it is through furnishing a crane, barge, excavator, scissor lift, scaffolding, loader, compressor, generator, shoring, pump, etc. Routinely, the trade subcontractor that needs the equipment to perform its contractual scope...
About The Author

David Adelstein
Phone: (954) 361-4720
Email: Dadelstein@gmail.com
Pages
- About Me (David Adelstein)
- Bid Protests (Florida bid protests and Federal bid protests)
- Construction & Design Defects (and Florida Statutes Chapter 558)
- Construction Contracts
- Construction Liens
- Construction Safety, Workers Compensation Insurance, and Premise Liability Claims
- Delays, Acceleration, and Inefficiency (Lost Productivity)
- Insurance and Performance Bonds
- Payment Bonds Including Miller Act