Recent Posts
YOU NEED TO BE A CONTRACTOR FOR WORKERS’ COMPENSATION IMMUNITY TO APPLY
Posted on 18 October, 2020
If you are a contractor, you are aware of workers' compensation immunity when it comes to injuries on the site; and, if not, you should be. It is this workers' compensation immunity (where workers compensation is the exclusive form of liability for an injured employee) which is why a contractor...
QUICK NOTE: STEPS TO PROTECT AND AVOID THE “MISAPPROPRIATION” OF A “TRADE SECRET”
Posted on 11 October, 2020
Florida’s Uniform Trade Secret Act (included in Florida Statute s. 688.001 en seq.) defines the terms “trade secret” and “misappropriation.” These definitions (found here) are important in that just because 1) we deem something a trade secret does not, in of itself, make it so, and...
MEASURE OF DAMAGES FOR A CHATTEL INCLUDING LOSS OF USE
Posted on 10 October, 2020
In a non-construction case, but an interesting case nonetheless, the Second District Court of Appeals talks about the measure of damages when dealing with chattel (property) including loss of use damages. Chattel, you say? While certainly not a word used in everyday language, a...
EQUITABLE LIEN DESIGNED TO PREVENT UNJUST ENRICHMENT
Posted on 4 October, 2020
There are instances where a party does not have construction lien rights but, nevertheless, feels the need to pursue an equitable lien against the real property.
No different than a construction lien, an action to enforce an equitable lien has a one-year limitations period if it...
ECONOMIC LOSS RULE BARS CLAIMS AGAINST MANUFACTURER
Posted on 20 September, 2020
The economic loss rule lives to bar a claim against a product manufacturer in a real estate transaction. In a products liability action, there needs to be personal injury or property damage, other than to the property itself, in order to recover economic damages. ...
About The Author
David Adelstein
Phone: (954) 361-4720
Email: Dadelstein@gmail.com
Pages
- About Me (David Adelstein)
- Bid Protests (Florida bid protests and Federal bid protests)
- Construction & Design Defects (and Florida Statutes Chapter 558)
- Construction Contracts
- Construction Liens
- Construction Safety, Workers Compensation Insurance, and Premise Liability Claims
- Delays, Acceleration, and Inefficiency (Lost Productivity)
- Insurance and Performance Bonds
- Payment Bonds Including Miller Act