DOES YOUR JURISDICTION RECOGNIZE THE CARDINAL CHANGE DOCTRINE?
Posted on 26 June, 2022
The contract was cardinally changed. Have you heard that before? It is a “sexy” doctrine, but, in actuality, cardinal change is hard to demonstrate. Under certain factual scenarios, it could have traction, but whether it will be recognized in the jurisdiction is typically a...
FOUR ELEMENTS TO PROVE TYPE 1 DIFFERING SITE CONDITIONS CLAIM
Posted on 18 June, 2022
There are two types of differing site conditions claims. A Type 1 claim and a Type 2 claim. The Federal Acquisition Regulations (FAR) describes these claims, which are often described similarly in any construction contract that has a
IF YOU WANT TO ARBITRATE, DON’T WAIVE YOUR RIGHTS TO DO SO
Posted on 12 June, 2022
I have said this before, but it is worth saying it again. Arbitration is a creature of contract. This means if you want your dispute to be decided by an arbitrator through a binding arbitration process, you need have a written arbitration agreement. Such agreement is...
QUICK NOTE: PURCHASE-AND-SALE CONTRACTS AND THREE POINTERS
Posted on 5 June, 2022
MILLER ACT STATUTE OF LIMITATIONS AND EQUITABLE TOLLING
Posted on 4 June, 2022
When it comes to a Miller Act payment bond claim, there is a one-year statute of limitations—“The Miller Act contains a statute of limitations provision that requires actions to ‘be brought no later than one year after the day on which the last of the labor was performed...
About The Author

David Adelstein
Phone: (954) 361-4720
Email: Dadelstein@gmail.com
Pages
- About Me (David Adelstein)
- Bid Protests (Florida bid protests and Federal bid protests)
- Construction & Design Defects (and Florida Statutes Chapter 558)
- Construction Contracts
- Construction Liens
- Construction Safety, Workers Compensation Insurance, and Premise Liability Claims
- Delays, Acceleration, and Inefficiency (Lost Productivity)
- Insurance and Performance Bonds
- Payment Bonds Including Miller Act